scaffolding accessories base jack/galvanized steel pipe jack base/u head jack base scaffolding

Share on:

Price in USD:
Price:$5.00 - $10.00

Quantity:


Product Overview

Description


_04_01.jpg



PRODUCT DESCRIPTION


 _01.jpg


 























































































































Name



Type



Size



 



 



Screw rod



Base plate



Adjustable Base Jack



      Hollow



38*4*600mm



150*150*5mm



 



 



42*4*600mm



150*150*5mm



 



 



48*4*600mm



150*150*5mm



 



 



48*5*400mm



150*150*5mm



 



 



48*5*500mm



150*150*5mm



 



 



48*5*600mm



150*150*5mm



Adjustable Base Jack



      Solid



30*400mm



120*120*5mm



 



 



30*600mm



120*120*5mm



 



 



32*400mm



120*120*5mm



 



 



35*500mm



150*150*5mm



 



 



38*750mm



150*150*5mm



 



 



45*600mm



150*150*5mm



Adjustable U-head Jack



Solid



30*400mm



150*120*50*5mm



 



 



30*600mm



150*120*50*5mm



 



 



32*400mm



150*120*50*5mm



 



 



32*600mm



150*120*50*5mm



 



 



34*600mm



150*120*50*5mm



 


 





COMPANY PROFILE


_04_03.jpg 





CERTIFICATE


_04_07.jpg 





PRODUCTION PROCESS


_04_05.jpg


 


_04_06.jpg


 





MAIN PRODUCTS


_04_04.jpg 





PACKAGING LOGISTICS


_02.jpg


 





FAQ


_04_10.jpg 


1.How to buy your ideal products?


You can provide us your drawing, and we will produce as your drawing.


Or we can design as your requirements if you do not have a clear plan.


2.How to pay? 


TT and L/C are acceptable and TT will be more appreciated.


3.What is the delivery time? 


It depends on order quantity.


Generally, the delivery time will be within 10 to 15 days.


4.How about our product quality?  


Our steel prop piles are manufactured with first quality materials


5.What is steel quality?  


This system is built from Q235 steel conical pipe with welded blades,


and can be applied in a wide variety of different geological locations.


6.How to order from Zhiyi ? 


Buyer Send Enquiry →Get Zhiyi Quotation → Order Confirmation


→ Buyer Arrange 30% Deposit → Production Started upon Receipt of Deposit


→ Strict Inspection during Production → Buyer Arrange Balance Payment


→ Packing → Delivery as per Trade Terms (FOB/CFR/CIF)


 





CONTACT US


_09.jpg 




0.0104 s.