Quality assurance and 15.3 kw Power gantry palletizer for bag of cement

Share on:

Price in USD:
Price:$66,000.00 - $70,000.00

Quantity:


Product Overview

Description


NOTE: The specific mode of transportation, freight and delivery time shall be subject to negotiation and communication between the parties ! ! !

Quality assurance and 15.3 kw Power gantry palletizer for bag of cement

3_01.jpg

Products Display

3_05.jpg

 13.JPG14.JPG1.JPG7.JPG2.jpg8.JPG

Products Description

3_03_02.jpg

According to a certain order, palletizer stacks the packed products(in box, bag, bucket) to the corresponding empty pallets through a series of mechanical actions so as to facilitate handling and transporting batches of products to improve production efficiency. Meanwhile it can use stack layer pad to improve the stability of each stack layer. Various forms designed to meet different palletizing requirements.

 Electrical Configuration:

PLC

Siemens

Frequency Converter

Danfoss

Photoelectricity Inductor

SICK

Driving Motor

SEW

Pneumatic Components

SMC

LOW-voltage Apparatus

Schneider

Touch Screen

Schneider

Servo Panasonic
 
 Technical Parameter:

Stack Speed

40 cartons per minute, 4-5 layers per min

Height of Carton case

>100mm

Max. carrying capacity /layer 

150Kg

Max. carrying capacity /pallet

Max 1500kG

Max. stack height

1800mm

Installation Power

15.3KW

Air Pressure

≥0.6MPa

Power

380V.50Hz , three-phase four-wire

Consumption of the Air

600L/Min

Size of the Pallet

According to customer reqirement

After Sales Protection:

1. Ensure outstanding quality
2. Professional engineers with more than 7 years experience, all in readiness
3. Available on-site installation and debugging
4. Experienced foreign trade staff to guarantee instant and efficient communication
5. Provide lifelong technical support
6. Provide operation training if necessary
7. Quick response and in-time installation
8. Provide professional OEM&ODM service

Main Products

 

 

Company Information

3_09.jpg

PackingShipping

3_11_01.jpg

Trade&Market

3_11_02.jpg

FAQ

3_12.jpg

VALIDITY OF THE OFFER

30 days from the date of quotation sent

 

DELIVERY

Approx. 60 days from order confirmation

 

PAYMENT

30% as deposit by T/T, 70% paid before shipment by T/T.

 

INSTALLATION &COMMISSIONING

The seller will dispatch one engineer to the buyer's factory for installation and commissioning and training, the buyer should be responsible for the room and board and the go-back air tickets and visa fee, and the allowance of 100 USD per day for each person each day.

 

NOTE

1. If delays occur due to the fault of either party involved, then any extracost shall be borne by the party at fault

 

2. The Customer is responsible for providing continuous supply of quality electricity for the duration of the installation, commissioning and test running, which must be available prior to the arrival of technicians from the Manufacturer.

 

SAMPLES

Sufficient quantity of product samples must be sent byCustomers toManufacturerwithin 15 days after order confirmation for technical clarification.Delays in sending the required samples may affect the delivery schedule of the machines, of which the Manufacturer bears no responsibility for the cost of sending the samples is at Customer's charge.

 

GUARANTEES

 The guarantee covers the replacement f.o.c. of the parts that are comprised in the supply and those

acknowledged to bear manufacturing faults or are materials that contribute to the incorrect function of

the machine

 

 Lilan guarantees the products supplied for a 12-month period as of from the date of the startup but

however, not more than 18 months from the date of the relative invoice.

 

 As for the electrical and electronic parts, the guarantee lasts for 6 months from the startup date but

however, not more than 12 months from the date of the relative invoice.

 

 Merchandise that is supplied under guarantee will be delivered with pre-paid freight and packaging

 

 Other relevant guarantees kindly see the operation and appliance manuals sent with equipment.

 

Note:All the accurate technical data should be confirmed in the meantime contract is confirmed

Contact Us
sds.jpg

0.0076 s.